International QA/QC Protocol

Quality Assurance & Site Safety Standards

Ensuring structural integrity through rigorous material testing, formwork precision, and curing protocols.

1. EUO Modular Formwork Systems

Deploying high-grade EUO modular steel and plywood formwork panels to prevent slurry leakage, ensuring plumb alignment and a smooth mirror-like concrete surface finish on retaining walls and shear shafts.

Quality Inspection Points:

  • Plumb line alignment verification
  • Tie-rod tension locking
  • Slurry-tight seal inspection

2. Soil Compaction & Sub-Grade Rigor

Conducting Proctor density testing and mechanized compactor roller passes on sub-grade soil prior to casting pile caps, footings, or heavy industrial floor slabs to prevent settlement cracking.

Quality Inspection Points:

  • Proctor density test verification
  • Plate compactor roller passes
  • Moisture content calibration

3. Rebar Cage Fabrication & Concrete Cover

Utilizing certified high-yield deformed steel rebar with exact bar-bending schedules, lap length overlaps, and high-density concrete spacer blocks to guarantee cover depth against corrosion.

Quality Inspection Points:

  • Deformed rebar yield strength verification
  • Concrete cover spacer block placement
  • Structural lap splice length inspection

4. Concrete Slab Curing & Hydration Control

Enforcing 7-to-28 day continuous moist curing protocols using ponding, wet hessian sheets, or liquid curing membranes to achieve design compressive strength and eliminate plastic shrinkage cracks.

Quality Inspection Points:

  • 7-28 day moist ponding cycle
  • Compressive strength cube test checks
  • Thermal shrinkage prevention

Build with Verified Quality Assurance

Request an engineering site visit and technical proposal for your upcoming development.

Project Quote Request Form

DICA Reg. No. 112707107 • Trillion Kyaw Construction